Operating InstructionsVEGABAR 524 … 20 mA/HART - climatecompensatedDocument ID:35075Process pressure/Hydrostaticp
l withthe suitable VEGA DTM in conjunction with an adjustmentsoftware according to the FDT/DTM standard, e.g. PACTware andPCl with manufacturer-specifi
4 Mounting4.1 General instructionsMake sure that all parts of the instrument in contact with the measuredproduct, especially the sensor element, proce
21222111Fig. 3: Positionof the filter elements1 Filter element for ventilation of the electronics housing2 Filter element for ventilation of the measur
4.2 Mounting instructionsVEGABAR 52 functions in any installation position. It is mountedaccording to the same directives as a manometer (DIN EN 839-2
5 Connecting to power supply5.1 Preparing the connectionAlways keep in mind the following safety instructions:l Connect only in the complete absence o
Caution:Nogrease should be used when screwing the NPT cable gland orsteel tube into the threaded insert. Standard grease can containadditives that cor
11 Tightenthe compression nut of the cable entry. The seal ring mustcompletely encircle the cable12 Screw the housing cover onThe electrical connectio
1 243Fig. 6: Materialversions, single chamber housing1 Plastic2 Aluminium3 Stainless steel4 Stainless steel castingI²CDisplay1 2 5 6 7 83412Fig. 7: El
I2CDisplay11 2 56 7 8Fig. 8: Wiringplan, single chamber housing1 Voltage supply/Signal output5.4 Wiring plan, double chamber housingThe following illu
132Display1 2 5 6 7 8I²CFig. 10: Electronicscompartment, double chamber housing1 Plug connector for VEGACONNECT (I²C interface)2 Internal connection c
Contents1 About this document1.1 Function. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41.2 Target group . . . . . . . . . . . .
I2C11 2Fig. 12: Wiringplan, double chamber housing1 Voltage supply/Signal output5.5 Switch on phaseAfter connecting VEGABAR 52 to power supply or afte
6 Setup with the indicating and adjustmentmodule PLICSCOM6.1 Short descriptionThe indicating and adjustment module is used for measured valuedisplay,
Fig. 13: Mountingthe indicating and adjustment moduleNote:Ifyou intend to retrofit the instrument with an indicating and adjustmentmodule for continuou
6.3 Adjustment system1.1231Fig. 14: Indicatingand adjustment elements1 LC display2 Indication of the menu item number3 Adjustment keysl [OK] key:- Mov
6.4 SetupprocedureIn HART-Multidrop mode (several sensors on one input) the addressmust be set before continuing with the parameter adjustment. You wi
Toselect the adjustment unit (in the example switching over from barto mbar) you have to proceed as follows:1)1 Push the [OK] button in the measured v
Unit of measurementDensity0001000kg/dm³6 Enter the requested density value with [->] and [+], confirm with[OK] and move to position correction with
5 Confirmwith [+] and move to max. adjustment with [->].The min. adjustment is finished.Information:For an adjustment with filling, you simply enter t
The position correction compensates the influence of the mountingposition or static pressure on the measurement. It does not influencethe adjustment val
▶Basic adjustmentDisplayDiagnosticsServiceInfo2 Confirm the menu "Basic adjustment" with [OK], the menu item"Unit" will be displaye
8 Maintenance and fault rectification8.1 Maintain. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .398.2 Remove interferences. . . . .
Proceed as follows:1 Edit the mbar value in the menu item "zero" with [OK].Zero adjustment000.0 %P=+0000.0 mbar0000.0 mbar2 Set the requeste
A linearization is necessary for all vessels in which the vessel volumedoes not increase linearly with the level - e. g. with a cylindrical orspherica
Menusection Function Reset valueBasic settings Unit of measurement barTemperature unit °CZero/Min. adjustment Measuring range beginSpan/Max. adjustmen
6.5 MenuschematicInformation:Depending on the version and application, the highlighted menuwindows are not always available.Basic adjustment1▶Basic ad
Diagnostics3Basic adjustmentDisplay▶DiagnosticsServiceInfo3.1Pointerp-min.: -5.8 mbarp-max.: 167.5 mbarT-min.: -12.5 °CT-max.: +85.5 °C3.2Sensor statu
6.6 Savingthe parameter adjustment dataIt is recommended noting the adjusted data, e.g. in this operatinginstructions manual and archive them afterwar
7 Setupwith PACTware and other adjustmentprograms7.1 Connect the PC via VEGACONNECT312Fig. 15: Connectionof the PC via VEGACONNECT directly to the sen
Necessary components:l VEGABAR 52l PC with PACTware and suitable VEGA DTMl VEGACONNECTl Power supply unit or processing system12 43OPENTWISTUSBLOCKFig
Allcurrently available VEGA DTMs are provided in the DTM Collectionon CD and can be obtained from the responsible VEGA agency for atoken fee. This CD
8 Maintenance and fault rectification8.1 MaintainWhen used in the correct way, no special maintenance is required innormal operation.In some applicatio
1 About this document1.1 FunctionThis operating instructions manual provides all the information youneed for mounting, connection and setup as well as
? 4 … 20 mA signal not stablel Level fluctuationsà Set the integration time via the indicating and adjustmentmodule or PACTwarel no atmospheric pressur
8.3 Calculation of total deviation (similar toDIN 16086)The total deviation Ftotalaccording to DIN 16086 is the sum of basicaccuracy Fperfand longterm
Basicaccuracy analogue output signal in percent:Fperf= √((FT)2+ (FKl)2+ (Fa)2)FT= (0.02 + 0.03 x TD)%/10 KFKl= (0.05 + 0.025 x TD)%Fa= 0.15 %Fperf= √(
Connect the sensor to power supply and provide connection from PCto the instrument via VEGACONNECT. Start PACTware and provideconnection to the sensor
9 Dismounting9.1 Dismounting stepsWarning:Before dismounting, be aware of dangerous process conditions suchas e.g. pressure in the vessel, high temper
10 Supplement10.1 Technical dataGeneral dataParameter, pressure Gauge pressure, vacuumMeasuring principle Ceramic-capacitive, dry measuring cellCommun
Dynamic behaviour outputRun-up time approx. 10 s90 %100 %10 %ttTAttS21Fig. 18: Suddenchange of the process variable, dead time tT, rise time tAand ste
Adjustment range of the zero/span adjustment relating to the nominal measuring range:- zero -20 … +95 %- Span -120 … +120 %7)- Difference between zero
Nominalrange Overload, max. pressure Overload, min. pressure-15 … 25 psig 700 psig -15 psig-15 … 70 psig 950 psig -15 psig-15 … 150 psig 1300 psig -15
Nominalmeasuring range inbar/kPaNominalmeasuringrange in psigAverage temperature coeffi-cient of the zero signal9)Average temperature coeffi-cient of the
2 For your safety2.1 Authorised personnelAll operations described in this operating instructions manual must becarried out only by trained specialist
Nominalmeasuring range in bar/kPa Nominal measuringrange in psigLong-term drift of the zero signal-0.1 … 0.1 bar/-10 … 10 kPa -1.5 … 1.5 psig < (1
Electromechanical data - version IP 66/IP 67Cable entry/plug14)- Single chamber housing l 1 x cable gland M20 x 1.5 (cable: ø 5 … 9 mm),1 x blind stop
Electromechanical data - version IP 66/IP 68, 1 barCable entry- Single chamber housing l 1 x IP 68 cable gland M20 x 1.5; 1 x blindstopper M20 x 1.5or
Power supplyOperating voltage- Non-Ex instrument 12 … 36 V DC- EEx-ia instrument 12 … 30 V DCOperating voltage with lighted indicating and adjustment
Forthese instruments, the corresponding approval documents have to be taken into account.These are part of the delivery or can be downloaded underwww.
10.2 DimensionsHousing in protection class IP 66/IP 67~ 69 mm(2.72")ø 77 mm(3.03")112 mm (4 13/32")M20x1,5/½ NPT~ 69 mm(2.72")ø 77
Housing in protection IP 66 /IP 68, 1 bar117 mm (4.61")120 mm (4.72")~ 103 mm(4.06")~ 105 mm (4.13")ø 77 mm(3.03")116 mm (4.5
VEGABAR 52 - threaded fittingGJ GN/GMGI/GT/GCGBGSGP/GL/GU/GKSW 27 mm(1 1/16")G½AG½AG¼A23 mm(29/32")73 mm(2 7/8")70 mm(2 3/4")17 mm(
10.3 Industrial property rightsVEGA product lines are global protected by industrial property rights.Further information see http://www.vega.com.Only
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 5910 Supplement35075-EN-081209
2.5 Safetyapproval markings and safety tipsThe safety approval markings and safety tips on the device must beobserved.2.6 CE conformityThis device ful
60 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 6110 Supplement35075-EN-081209
62 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 6310 Supplement35075-EN-081209
64 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 6510 Supplement35075-EN-081209
66 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 6710 Supplement35075-EN-081209
68 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 6910 Supplement35075-EN-081209
l Chapter "Packaging, transport and storage"l Chapter "Disposal"VEGABAR 52 • 4 … 20 mA/HART - climate compensated 72 Foryour safet
70 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 7110 Supplement35075-EN-081209
72 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 7310 Supplement35075-EN-081209
74 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 7510 Supplement35075-EN-081209
8)Incl. non-linearity, hysteresisand non-repeatability.9)In the compensated temperature range 0 … +100 °C (+32 … +212 °F),reference temperature 20 °C
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 7710 Supplement35075-EN-081209
11)Withprocess fitting PVDF, max. 100 °C (212 °F).12)Tested according to the regulations of German Lloyd, GL directive 2.13)Tested according to EN 6006
14)Dependingon the version M12 x 1, according to DIN 43650, Harting, 7/8" FF.VEGABAR 52 • 4 … 20 mA/HART - climate compensated 7910 Supplement350
3 Product description3.1 ConfigurationThe scope of delivery encompasses:l VEGABAR 52 process pressure transmitterl Documentation- this operating instru
80 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
15)Instrumentswith gauge pressure measuring ranges cannot detect the am-bient pressure when submerged, e.g. in water. This can lead to falsificationof
82 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 8310 Supplement35075-EN-081209
84 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 8510 Supplement35075-EN-081209
86 VEGABAR 52 • 4 … 20 mA/HART - climate compensated10 Supplement35075-EN-081209
VEGABAR 52 • 4 … 20 mA/HART - climate compensated 8710 Supplement35075-EN-081209
VEGA Grieshaber KGAm Hohenstein 11377761 SchiltachGermanyPhone +49 7836 50-0Fax +49 7836 50-201E-mail: [email protected] date:ISO 9
l Technical data: Measuring range, process pressure, processtemperature, signal output, voltage supply, protection, protectionclassl Order numberl Art