Vega POINTRAC 31 Foundation Fieldbus Bedienungsanleitung Seite 18

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 60
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 17
18
5 Connecting to power supply
POINTRAC 31 • Foundation Fieldbus
41779-EN-131119
6. Insert the wire ends into the round openings of the terminals ac-
cording to the wiring plan
Information:
Solidcoresaswellasexiblecoreswithcableendsleevesare
inserteddirectlyintotheterminalopenings.Incaseofexiblecores
without end sleeves, press the rectangular lock opening with a small
screwdriver; the terminal opening is freed. When the screwdriver is
released, the terminal opening closes again.
7. Check the hold of the wires in the terminals by lightly pulling on
them
Toloosenaline,insertasmallslottedscrewdriverrmlyintothe
rectangular locking opening according to the illustration
8. Connect the screen to the internal ground terminal, connect the
outer ground terminal to potential equalisation
9. Tighten the compression nut of the cable entry gland. The seal
ring must completely encircle the cable
10. Screw the housing cover back on
Theelectricalconnectionishencenished.
Information:
The terminal blocks are pluggable and can be detached from the
electronics. For this purpose loosen the two lateral locking levers of
the terminal block with a small screwdriver. When loosening the lock-
ing,theterminalblockisautomaticallysqueezedout.Itmustsnapin
place when re-inserted.
Seitenansicht 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 59 60

Kommentare zu diesen Handbüchern

Keine Kommentare