Vega VEGABAR 52 Foundation Fieldbus Bedienungsanleitung Seite 13

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 72
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 12
13
4 Mounting
VEGABAR 52 • Foundation Fieldbus
36720-EN-130321
2
1
2
1
2
1
1
2
Fig. 4: Position of the lter element
1 Filter element
2 Blind plug
Caution:
Duetotheltereect,thepressurecompensationistimedelayed.
When opening/closing the housing cover quickly, the measured value
can change for a period of approx. 5 s by up to 15 mbar.
Information:
Makesurethatthelterelementisalwaysfreeofbuildupduring
operation. A high-pressure cleaner may not be used for cleaning.
With instrument versions in protection IP 66/IP 68, 1 bar, the ventila-
tion is realised via the capillaries in the permanently connected cable.
Thelterelementisreplacedbyablindplug.
Higher process temperatures often mean also higher ambient
temperatures. Make sure that the upper temperature limits stated in
chapter"Technical data"fortheenvironmentoftheelectronicshous-
ing and connection cable are not exceeded.
1
2
Fig. 5: Temperature ranges
1 Process temperature
2 Ambient temperature
Temperature limits
Seitenansicht 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 71 72

Kommentare zu diesen Handbüchern

Keine Kommentare