Vega VEGABAR 66 4 … 20 mA_HART - climate compensated Bedienungsanleitung Seite 12

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 76
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 11
12
4 Mounting
VEGABAR 66 • 4 … 20 mA/HART - climate compensated
36738-EN-130321
4 Mounting
4.1 General instructions
Make sure that all parts of the instrument coming in direct contact
with the process, especially the sensor element, process seal and
processtting,aresuitablefortheexistingprocessconditions,such
as process pressure, process temperature as well as the chemical
properties of the medium.
Youcanndthespecicationsinchapter"Technical data"andonthe
nameplate.
Select an installation position you can easily reach for mounting and
connectingaswellaslaterretrottingofadisplayandadjustment
module. The housing can be rotated by 330° without the use of any
tools. You can also install the display and adjustment module in four
dierentpositions(eachdisplacedby90°).
Usetherecommendedcables(seechapter"Connecting to power
supply
")andtightenthecablegland.
You can give your instrument additional protection against moisture
penetration by leading the connection cable downward in front of the
cableentry.Rainandcondensationwatercanthusdraino.Thisap-
plies mainly to outdoor mounting as well as installation in areas where
high humidity is expected (e.g. through cleaning processes) or on
cooled or heated vessels.
Fig. 3: Measures against moisture penetration
The ventilation of the electronics housing as well as the atmospheric
pressurecompensationforthemeasuringcellarerealisedviaalter
element in the area of the cable gland.
Suitability for the process
conditions
Installation position
Moisture
V
entilation and pressure
compensation
Seitenansicht 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 75 76

Kommentare zu diesen Handbüchern

Keine Kommentare