52
8 Diagnosis, asset management and service
VEGABAR 81 • Modbus and Levelmaster protocol
46293-EN-131107
1
2
53
4
Fig. 31: VEGABAR 81 in IP 68 version, 25 bar and lateral cable outlet, external
housing
1 Process assembly
2 Plug connector
3 Cable assembly
4 Connection cable
5 External housing
3. Loosen the plug connector
4. Mount the new process assembly on the measuring point
5. Plug the connector back in
6. Mount the cable assembly on the process assembly and turn it to
the desired position
7. Tightenthexingscrewwiththehexagonsocketwrench
Theexchangeisnished.
If there is no replacement part available on site, one can be ordered
from the agency serving you.
The necessary serial number can be found on the type label of the
instrument or on the delivery note.
8.7 Software update
The following components are required to update the sensor soft-
ware:
•
Sensor
•
Voltage supply
•
Interface adapter VEGACONNECT
•
PC with PACTware
•
Currentsensorsoftwareasle
Youcanndtheactualsensorsoftwareaswellasdetailedinfor-
mation of the procedure under "www.vega.com/downloads" and
"Software".
Kommentare zu diesen Handbüchern