4 Mounting
VEGABAR 52 • Probus PA
36719-EN-130321
4 Mounting
4.1 General instructions
Make sure that all parts of the instrument coming in direct contact
with the process, especially the sensor element, process seal and
process tting, are suitable for the existing process conditions, such
as process pressure, process temperature as well as the chemical
properties of the medium.
You can nd the specications in chapter "Technical data" and on the
nameplate.
Select an installation position you can easily reach for mounting and
connecting as well as later retrotting of a display and adjustment
module. The housing can be rotated by 330° without the use of any
tools. You can also install the display and adjustment module in four
dierent positions (each displaced by 90°).
Use the recommended cables (see chapter "Connecting to power
supply") and tighten the cable gland.
You can give your instrument additional protection against moisture
penetration by leading the connection cable downward in front of the
cable entry. Rain and condensation water can thus drain o. This ap-
plies mainly to outdoor mounting as well as installation in areas where
high humidity is expected (e.g. through cleaning processes) or on
cooled or heated vessels.
Fig. 3: Measures against moisture penetration
The ventilation of the electronics housing as well as the atmospheric
pressure compensation for the measuring cell are realised via a lter
element in the area of the cable gland.
Suitability for the process
conditions
Installation position
Moisture
V
entilation and pressure
compensation